Ecomuseo del Paesaggio

FROM THE MAP TO THE NETS/ACTUATION/APERITIF-PROJECT/PEDAOLONA

This translation is a draft by students of Maggiolini High School from Parabiago

lingua italiana  english Francais

PLIS Mills' Park(Milan - Italy)
Municipalities of Nerviano, Parabiago, Canegrate, San Vittore Olona, Legnano

A participate path for the qualification of the periurban landscape along the Olona river.

 Attachements

 Related pages

 Co-financings:
 
 
Mill's Park

       
Cariplo foundation

MILANO EXPO 2015

REGIONE LOMBARDIA
CONTRATTO DI FIUME


Share on Facebook
Collaborators:
Translations in English: Aurora Donnaloia, Tatiana Martinez
in Spanish: Simone Schipani
Web Site: Andrea Loperfido

PARTECIPATION>LANDSCAPE CENSUS>PLANNING>ACTUATION
THE OLONA RIVER' S TREATY



Happy Hour-Project
PEDAOLONA

Together we are going to talk about the sweet mobility to return back people to Olona river. 

Associations which operates for the sweet mobility are particularly invited.
Everyone who has already signed the agreement or wants to sign it, is welcomed.

 The PedaOlona Happy Hour project will postpone after Mulino day 2014 on 8/06/2014. 

The ones who didn’t come to the meetings can send us an e-mail with their project proposals.

REALIZED PLANNING ACTIVITIES MEMORANDUM

FIRST MEETING
MONDAY 19/05/2014
5.45 PM

A little floral (black locust flowers are out of season)  toast (aperitif offered by Diego) has gladden the PEDAoLONA participants – sustawable mobility along Olona river on 19/05/2014 (Legambiente of Parabiago and Nerviano, LIPU of Parabiago, Parabiago and Legnano’s municipality, US Legnanese, Confcommercio of Legnano, 1001 MI.SAV, Assesempione, Turismosempione).
We have discussed about the application of the cycling mobility plan AltoMilanese

1.according to the subsidiarity principle that is about the collaboration and sharing between equals which put resources in the net and take the responsibility to reach a shared aim which is of public interest.
2. in the SHORT PERIOD
3.privileging the rural roads net for a superior contact of the user with nature
  1. WHAT WE HAVE DONE:

In particular we have discussed about the document which Mills' Park and Parabiago’s municipality have edited as sustawable mobility projects and Altomilanese coordination for EXPO 2015 leader.


The shared aim between the participants is to achieve in a short time the itineraries (not necessary cycling lanes) feasible with safety, along the eight main guidelines.

To be concrete and face the subject also in view of Mills day 2014 on
08/06/2014
we have verified the possible itineraries on the main road Nerviano-Valle Olona (right and left hydrographic):
  1. See the itinerary on google maps
  2. Download the Kmz layout which may have to be modified on Google earth for contingent observations, integrations and modifications
  3. Suggest observations or integrations

Linked to this layouts there also are:

1.The itinerary Milano-Lugano stretch Rho-Legnano which is going to be made by feet on the occasion of Mills day 2014 with Trekking Italy:
-
 See the itinerary on Google maps

- Download the Kmz layout which may have to be modified on Google earth for contingent observations, integrations and modifications
2. The itinerary LET EXPO N. 2
- See the itinerary on Google maps
That itinerary is the sum of 4 main roads of cycling mobility plan Alto Milanese.

3.The great work made by Busto Garolfo e co. of united cycling lanes system Alto Milanese
-See the cycling layout chart that have been made
 
B. DECISIONS
Red and discussed the document and the Nerviano-Valle Olona layouts the participant decides:

0. to make in the short period the Nerviano-valle Olona layout privileging the dirty roads and passing some obstacoles such as Starquà mill layout, the one of the way near Empyre discotheque and the one between the depression and San Vittore Olona’s bank.

1. to
read carefully the document and send to the Mill’s Park possible observations

2. cycle societies will make the itinerary layout go since Castellanza with the indication of the critical things to solve, billboards included

3. it is going to be edited the draft copy of the temporary indication billboard

4. it is going to be put the temporary billboards to try on occasion of Mills day

5. there are going to be taken contacts with the bordering field owners of Empyre discotheque.